Review: 1.5 years with MVP Systems Job Automation Scheduler (JAMS)

Introduction:

I wrote a really quick review here about MVP systems JAMS product about 1 year or so ago (maybe a little less).  At the time, I was in search of a solution that could help me glue together several disjointed systems in a workflow.  Specifically, we were trying to integrate Veeam and CommVault backup’s together.  Veeam was of course doing the VM backup’s, and CommVault was copying the Veeam files to tape.  We’ve since moved on from Veeam, but JAMS has continued to be a vital part of our infrastructure.

What is JAMS?

The simple answer is it’s a centralized task scheduler, the long answer is its not only that, but a whole lot more.  This is a solution that replaces cron, windows task scheduler, SQL agent jobs, or pretty much anything else that you would normally use to schedule and execute something.

What makes up a JAMS solution?

There are four main components.

  • The JAMS server: This is clusterable component that schedules, queues and executes any jobs or workflows.
  • The JAMS client: This is the administration GUI.  Kind of self-explanatory, but this is where you would configure all of the settings for the various jobs, and server settings.
    • For windows, this also includes a Powershell module for CLI administration. Pretty sure they have a generic API, but I never bothered to look since PS was available.
  • The JAMS agent: This is a component that is installed on a system where you want to execute jobs.  All kinds of OS’s supported.
  • Microsoft SQL server: Check with MVP systems if other DB’s are supported, but we’re a MS shop, and SQL is on their list.  This is used to store the job history, job status, and pretty much the entire server configuration.  If this goes down, you have big issues to deal with J.  And yes, a clustered SQL server IS supported.

All in all, the infrastructure is pretty simple to understand and for smaller use cases, these roles can all be installed on the same system.

History:

I didn’t start out with JAMS, in fact, they were nowhere in sight when the initial problem came to fruition.  I figured this would be a relatively trivial Powershell solution, and started down the path of trying to write a quick workflow.  Building the logic for the workflow was actually pretty easy, but what I kept running into was the good ‘ol Kerberos double hop condition.  Never heard about it?   Read about it here.  In order to centralize the solution, I basically tried to build my own poor mans centralized task scheduler.  In order to keep it central, I was utilizing “invoke-command” to execute scripts on our Veeam server and our CommVault server.  With Veeam, our database was stored on a different server, so when my “invoke-command” executed against Veeam, my credentials were never passed along to the SQL server.  I was able to work around it by using CredSSP, but it wasn’t reliable.  Sometimes it would work, and sometimes I guess it would timeout or something similar (don’t really remember to be honest).  Then there was the issue with CommVault.  See they used old fashion EXE’s to start jobs (we were on v8) from the command line.  The commands I needed to run had to be executed in sequential order.  Anyone who has worked with Powershell’s “start-process” via invoke-command, knows that the “-wait” parameter is ignored.  I don’t recall the reason, but it was lame on MS part.  Ultimately, it was this that was the deal breaker, and so started the search for some sort of centralized task scheduler.
We ultimately landed on a cheap’o but well known solution called “VisualCron”.  I’ve got nothing against the solution, but after working with it for a few days, not only was it very hacked together, but it wasn’t the most user friendly solution.  So the search continued and we ultimately stumbled across JAMS.  It took a lot of creative searching to find them, but I’m glad we did.  After installing the trial, we knew it was the solution we were looking for, and the rest as they say, is history.

The pros:

  • Easy solution: Pretty easy to install the solution and understand the components. Unlike some other solutions we’ve installed, JAMS takes care of installing any pre-requisites and also has an easy to understand architecture.
  • You get tech support: Normally not something to write home about, but we leveraged their support quite a bit at first, and they were normally helpful.  As simple as JAMS is, it can do a lot of stuff, and that’s where support can (and is) a huge help.  I remember one part of a solution where were trying to pass a variable from one job to another.  Called up support, and sure enough, JAMS could do it and they showed us how.  How about bulk creating a bunch of jobs via PS?  Yep, support had an example of that too.
  • The GUI: This is one where I have pros and cons.   We’re in the pros section, so that’s what I’ll focus on here.
    • I’ve never worked with a GUI that was capable of bulk edits, but JAMS is and it rocks. Just imagine wanting to change the start time on 60 jobs.  You could write a script to do it, or you could highlight the 60 jobs in a folder, right click and basically change the value of one field (time) to another value.  Then BAM! It goes and changes the time for all highlighted jobs.  Pretty much any column you can add to the GUI has this functionality and it rocks.
    • Easy to see all jobs scheduled to run, running or failed in one view.
    • It keeps a detailed log of each job execution. If you write output to the host (think write-host in PowerShell or REM in batch), that output gets logged to a file and stored for historical purposes.  So as long as your script has verbose output, you’ll know exactly what happened in your job.
    • Sort of related to the above, it keeps a history of all executed jobs and their final status. It also tracks things like when it ran, how long it ran, how many resources it consumed, etc.
    • They have some pretty neat dashboards (once you figure them out). There are a few cool built in ones (like projected schedule) too.
    • Last but not least, it’s a pretty easy GUI to use. I won’t say it doesn’t have any learning curve, but I think the learning curve is really more related to the solution than the client its self.
  • Scripting engines: The agent can execute all kinds of scripts.
    • Powershell
    • Batch
    • Bash
    • SSH
    • T-SQL
  • Agent OS Support: The agent can be installed on different OS’s, so this isn’t a 100% windows only solution.
  • Workflows (setups): You can build “setups” (workflows) that tie jobs together. The jobs themselves can run on completely different systems.  In our case, we had a setup which had a “job” that ran on a veeam server and a different job that ran on the CV server.  The Setup was configured to wait until the first job completed with a success before moving on.
  • Job Queueing: It supports queueing jobs. Probably not an issue for many folks, but we used to limit the number of tape backup’s running in parallel.  What’s great is each “job” in jams can share a queue or have different queues.  This allows a Setup to execute the first job (as an example) and if needed, the second job will queue.  We typically had 50 setups running in parallel, but only 4 tape jobs that were allowed to run in parallel.  JAMS would execute all 50 setups in parallel, but when it came time to run the tape portion of a setup, the tape jobs would go into a queue and trickle out as others completed (or failed).  This didn’t stop the first jobs (the backup its self) from completing, so it ultimately kept things moving at a great pace.
  • PowerShell: Being able to admin JAMS through PS is a huge win in my book.  You can create, modify and delete, jobs, setups, queues, etc.  Everything in the GUI can be done in PS.  It’s sad in 2017 that I even have to list this as a pro of a solution. None the less, it’s not as common as it should be, and it’s a win for JAMS.
  • Different Licensing: With a lot of solutions, there’s only one licensing strategy. I found that JAMS had several, and they do so to accommodate differing needs and purposes.
  • Sales team: The sales team I worked with was friendly, knowledgeable and not pushy in any kind of way.  Additionally, what I think is worth noting, is while it felt like we were shopping for a Ferrari, they understood we were on a Corvette budget, and worked with us to find a licensing model (and some pricing breaks) to let us drive home in a solution we really wanted.

The cons:

  • Price: I’m not saying it’s overpriced, all I’m saying is its not cheap.  I would love to use this solution for my whole environment, but it’s not cheap to do that.  I’m not saying they won’t work with you (they will), but to scale the solution, you will be digging deeper in your wallet.
  • The GUI: I think the GUI has some great design characteristics, but I also think it has some flaws too.
    • They recently updated the GUI look. I’m personally not a fan.  It’s a matter of opinion of course, but I find it harder to see what I need to see now.
    • I don’t like the way they separate jobs from setups. I wish they just used a different icon, or a value in a field to separate them.  There are plenty of times I click on a folder and forgot that I’m in the “setup view” when I’m looking for a job.
    • They don’t support right click for certain job management features. I intuitively want to right click in the jobs window and select “new job” or something related, but that’s not the way the GUI is designed.
    • When you bulk submit jobs, they ask you if you want to, for each job. That means if you selected 25 jobs, you’re clicking “submit” 25 times afterwards.
  • Their security design: I found that their security model didn’t work quite like one might think.  I remember working with a tech to do something simple like let our DBA’s manage jobs (execute and read) and something as simple as that required what seemed like a million hoops to jump through.  Ultimately IIRC (it’s been a while) we ended up needing to grant them more rights than I would have wanted in order to accomplish what seemed like a trivial task.  I gave up on it because I didn’t want to create a solution that going to be too complex to manage.
  • Overlapping job detection: I remember when I first started with their solution, we had run into a few cases where jobs (or setups) were overlapping on themselves.  Meaning Job A from Monday night was still running and Tuesday nights job started up and started running.  When I asked support about this, they handed me a script that would nuke the Tuesday job, but ultimately didn’t solve my issue of needing Tuesday’s job to just wait.  I ultimately ended up writing a pre-check job that would detect if any of the same jobs were running and if so, to go into a loop where it checks every minute, waiting for the previous job to complete.  What sucks about this and the script they gave me, is every job I launch that has a pre-check job, this ends up burning my job count.  To me, this just seems like something that should be built into the solution.
  • Maintenance Mode: They don’t seem to have a maintenance mode option.  What I mean by that, is being able to put JAMS into a paused state.  I think you can stop a service on the windows hosts, but honestly that’s a hack.  They should just have a maintenance mode option built right into the GUI.   I could see something like having a few options like, queue any new jobs that start, or let existing jobs finish, but queue anything new, or don’t let any jobs start at all.  Bonus points if this could be done at a folder level.

Conclusion:

Ultimately after living with JAMS for almost 1.5 years, I think they really rock as a solution.  I can’t say I have any experience with any other enterprise job scheduling solutions, but my overall experience with JAMS has been a pleasure.  No solution is perfect, and theirs is no exception, but the great news is they have a solution that is ultimately awesome, with a few negatives, which is a far cry from other vendor’s solutions I’ve used.  My suggestion is if you’re looking for something to replace SQL jobs, task scheduler, cron or any other isolated solution, to give them a look, I think you’ll be pleased.

Problem Solving: CommVault tape usage

Introduction:

I hate dealing with tapes, pretty much every aspect of them.  The tracking of them is a PITA, having to physically manage them is a PITA, dealing with tape library issues is a PITA, dealing with tape encryption is a PITA, running out of tapes is a PITA, dealing with legal hold for tapes is a PITA, and I could keep going on with the many ways that tape just sucks.  What makes matters worse is when you have to deal with MORE tapes.

Now that you know tapes are one of my personal seven levels of hell in IT, you’ll know why I put a bit of time into this solution.  Anything I can do to reduce the number of tapes getting exported every day, ultimately leads to some reduction in the PITA scale of tapes.

The issue:

To provide a better understanding of the issue at hand, for years I’ve been seeing way too many tapes being used by CV.  We’d kick out tapes that had 5% or 10% consumption, and the number of tapes with that level of consumption varied based on what phase of our backup strategy we were in, and what day of the week it was.  It could be anything as small as 4 partially filled tapes, to times where we had 10+ tapes that weren’t filled all the way up.  If the consumed data should fit on 16 tapes, and we’re kicking out 26 tapes, that’s a problem IMO.  I’m sure many of you out there have contended with this in CV specifically, and I’d bet those of you using other vendors products have run into this too.  I’m going to first explain why the problem is occurring, and then I’ll go over how I’ve reduced most of the waste.

The Why?

In CV, we have storage policies, and short of going into an explanation of what they are for others not familiar with CV, just think of it as an island of backup data.  That island of data doesn’t co-mingle with other islands of data on disk, and tape is no exclusion.  What that means is when you backup data to a storage policy and want to copy it to tape, that data getting copied to tape will automatically reserve the entire tape being used.  In turn, each storage policy then reserves its own unique tapes so that data does not co-mingle together.  This means for every storage policy you have, you’re guaranteed at least one unique tape per storage policy at a minimum.  Now, each storage policy can have a number of streams configured.  To keep things simple, let’s just ignore multiplexing for now.  When a storage policy has a stream limit of 1, that means only 1 tape drive will be used, when it has a stream policy of 4, that means 4 tape drives will be used.  Now, as you copy data to tape, you normally have more than 1 streams worth of data, you probably have at least one for each client in your environment (and likely much more than that).  This is a good thing, having more streams means we can run data copy operations in parallel.  In the case of the 4 streams example, that means we can use 4 tape drives in parallel to copy data for the example storage policy.  What this also means is depending on circumstances, we could end up with 4 tapes not being filled all the way as well.  Streams are optimized for performance, NOT for improving tape utilization.  Now, imagine you have more than one storage policy, let’s just say 4 storage polices, each being their own island, and each with a stream limit of 2.  That means you could end up with up to 8 tapes not being fully utilized.  I’m also ignoring for now that in CV, you can separate incremental and fulls to different storage policies which exacerbates the problem further (taking one island and making it two).

In our case, we have 4 storage policies and we had gone through a process of merging our Fulls and Incs into a single storage policy to consolidate tapes already.  We have a total of 6 tape drives, which means if we just configured the storage policies to fight over the tape drives @6 streams each, we could end up in theory with 24 partially filled tapes.  We’re smarter than that of course, so that wasn’t out problem.  Our problem was finding the right balance between how many streams a storage policy needed to copy all its data in our window, and not making it so high that we ended up wasting tape.  Pre-solution, we almost always had 4 – 6 tapes that were wasted, as in 100GB on a 2000GB tape.  It was annoying and wasteful.

Solution, problems again, improved solution:

There are two main components to the solution.

  • Scripting storage policy stream modification via task scheduler (MVP JAMS in our case).
  • CommVault introducing Global Tape Policies in v11
    • This allows tapes to be shared, no longer residing on an island as mentioned above. So storage policy 1, 2, 3 and 4 can all share the same tape.  Way more efficient.

In our case, when we saw the global tape policy, it was like a halo of light and angels singing, going off in our head.  This was it, our problems were FINALLY solved.  After going through the very tedious task of migrating to this solution, we found that we were still using 4 – 6 tapes a day more than we needed.  The problem was not that data was not co-mingling, it was.  No, the problem was that we set the global tape policy to 6 streams, and every day, it was using 6 tape drives for backups.   At first we tried to solve the problem by limiting the aux copy streams via a scheduled task in CV (start the job with 1 stream only as an example) but we had 4 storage polices, so that only reduced the tape usage to 4.  The problem again was that each storage police was scheduled and run in parallel.  So while we restricted any one storage policy, ultimately we were still letting more tape drives being used than needed and in turn more tapes than was needed.  We had set 6 streams, because we wanted to make sure that our FULL jobs had enough tape drives to complete over the weekend.

At this stage, I came to the conclusion that we needed a way to dynamically control the streams for the global tape policy so that during the week days it was restricted to 1 tape drive (all we needed) and on the weekend, we could start out with 6 and slowly ramp back down to 1, and hopefully more fully fill our tapes.  With a bit of research and some discussions with CV, I found out that they have a CLI option for controlling storage policy streams (found https://documentation.commvault.com/commvault/v10/article?p=features/storage_policies/storage_policy_xml_edit.htm).  Using my trusty scheduling tool, I setup a basic system where on Sunday @4PM we would set the streams to “1”, and then on Friday @4PM we would raise them to “6” and Saturday @7am we would drop them to “2”.  This basically solved our problem, and I’m happy to say that on week days, tapes are filled as much as is possible (1 – 2 tapes depending on which client ran a full), and on the weekend, 2 – 4 tapes are still being used.  I’m still tuning the whole thing, for the fulls (it’s a balance of utilization and performance), but its better than its ever been.  Its also worth noting, we went back and modified our aux copy schedules and told them to use all available streams since we now choke point it at the global tape policy.  This allows any storage policy to go as fast as possible (although potentially blocking other ones).

It’s a hack no doubt.  IMO, CV should develop this concept in their storage policies.  Basically creating a schedule window to dynamically control the queue depth.  For now, this is working well.

Problem Solving: Chasing SQL’s Dump

The Problem:

For years as an admin I’ve had to deal with SQL.  At a former employer, our SQL environment / databases were small, and backup licensing was based on agents, not capacity.  Fast forward to my current employer, we have a fairly decent sized SQL environment (60 – 70 servers), our backup’s are large , licensing is based on capacity, and we have a full time DBA crew that manage their own backup schedules, and prefer that backup’s are managed by them.  What that means is dealing with a ton of dumps.  Read into that as you want 🙂

When I started at my current employer, the SQL server backup architecture was kind of a mess.  To being with, where were then was about 40 – 50 physical SQL servers.  So when you’re picturing all of this, keep that in mind.  Some of these issues don’t go hand in hand with physical design limitations, but some do.

  • DAS was used for not only storage the SQL log, DB and index, but also backup’s.  Sometimes if the SQL server was critical enough, we had dedicated disks for backups, but that wasn’t typical.  This of course is a problem for many reasons.
    • Performance for not only backup’s but the SQL service its self were limited often because they were sharing the same disks.  So when a backup kicked off, SQL was reading from the same disks it was attempting to write to.  This wasn’t as big of an issue for the few systems that had dedicated disks, but even there, sometimes they were sharing the same RAID card, which meant you’re still potentially bottlenecking one for the other.
    • Capacity was spread across physical servers.  Some systems had plenty of space and others barely had enough.  Islands are never easy to manage.
    • If that SQL server went down, so did its most recent backup’s.  TL backup’s were also stored here (shudders).
    • Being a dev shop meant doing environment refreshes.  This meant creating and maintaining share / NTFS permissions across servers.  This by its self isn’t inherently difficult if its thought out ahead of time, but it wasn’t (not my design).
    • We were migrating to a virtual environment, and that virtual environment would be potentially vMotioning from one host to another.  DAS was a solution that wouldn’t work long term.
  • The DBA’s managed their backup schedules so it required us all to basically estimate when the best time to pickup their DB’s.  Sometimes we were too early and sometimes we could have started sooner.
  • Adding to the above points if we had a failed backup over night, or a backup that ran long, it had an effect on SQL’s performance during production hours.  This put us in a position of choosing between giving up on backing some data up, or having performance degradation.
  • We didn’t know when they did full’s vs diffs.  Which means, we might be storing thier DIFF files on what we considered “full” backup taps.  By its self not an issue, except for the fact that we did monthly extended fulls.  Meaning we kept the first full backup of each month for 90 days.  If that file we’re keeping is a diff file, that’ doesn’t do us any good.  However, you can see below, why it wasn’t as big of an issue in general.
  • Finally, the the problem that I contended with besides all of these, is that because they were just keeping ALL files on disk in the same location, every time we did a full backup, we backed EVERYTHING up.  Sometimes that was 2 weeks worth of data, TL’s, Diff’s and and Fulls.  This meant we were storing their backup data multiple times over on both disk and tape.

I’m sure there’s more than a few of you out there with similar design issues.  I’m going to lay out how I worked around some of the politics and budget limitation.  I wouldn’t suggest this solution as a first choice, its really not the right way to tackle it, but it is a way that works well for us, and might for you.  This solution of course isn’t limited to SQL.  Really anything that uses a backup file scheme could fit right into this solution.

The solution:

I spent days worth of my personal time while jogging, lifting, etc. just thinking about how to solve all these problems.  Some of them were easy and some of them would be technically complex, but doable.  I also spent hours with our DBA team collaborating on the rough solution I came up with, and honing it to work for both of us.

Here is basically what I came to the table with wanting to solve:

  • I wanted SQL dumping to a central location, no more local SQL backups.
  • The DBA’s wanted to simplify permissions for all environments to make DB refreshing easier.
  • I wanted to minimize or eliminate storing their backup data twice on disk.
  • I wanted them to have direct access to our agreed upon retention without needing to involve us for most historical restores.  Basically giving them self service recovery.
  • I wanted to eliminate backing up more data then we needed
  • I wanted to know for sure when they were done backing up and knowing what type of backup they performed.

Honestly we needed the fix, as the reality was we were moving towards a virtualizing our SQL infrastructure, and presenting local disk on SAN would be both expensive, but also incredibly complex to contend with for 60+ SQL servers.

How we did it:

Like I said, some of it was an easy fix, and some of it more complex, let’s break it down.

The easy stuff:

Backup performance and centralization:

We bought an affordable backup storage solution.  At the time of this writing it was and still is Microsoft Windows Storage Spaces.  After making that mistake, we’re now moving on to what we hope is a more reliable and mostly more simplistic Quantum QXS (DotHill) SAN using all NL-SAS disks.  Point being, instead of having SQL dump to local disk, we setup a fairly high performant file server cluster.   This gave us both high availability, and with the HW we  implemented, very high performance as well.

New problem we had to solve:

Having something centralized means you also have to think about the possibility of needing to move it at some point.  Given that many processes would be written around this new network share, we needed to make sure we could move data around on the backend, update some pointers and things go on without needing to make massive changes.  For that, we relied on DFS-N.  We had the SQL systems point at DFS shares instead of pointing at the raw share.  This is going to prove valuable as we move data very soon to the new SAN.

Reducing multiple disk copies and providing them direct access to historical backups:

The backup storage was sized to store ALL required standard retention, and we (SysAdmins) would continue managing extended retention using our backup solution.  For the most part this now means the DBA’s had access to the data they needed 99% of the time.  This solved the storing the data more than once on disk problem as we would no longer store their standard retention in CommVault, but instead rely on the SQL dumps they already are storing on disk (except extended retention).  They still get copied to tape and sent off site in case you thought that wasn’t covered BTW.

Simplifying backup share permissions:

The DBA’s wanted to simplify permissions, so we worked together and basically came up with a fairly simple folder structure.  We used the basic configuration below.

  • SQL backup root
    • PRD <—- DFS root / direct file share
      • example prd SQL server 1 folder
      • example prd SQL server 2 folder
      • etc.
    • STG <—– DFS root / direct file share
      • example stg SQL server 1 folder
      • etc.
    • etc.
  • Active Directory security group wise we set it up so that all prod SQL servers are part of a “prod” active directory group, all stage are part of a “stage” active directory group, etc.
  • The above AD groups were then assigned at the DFS root (Stg, prd, dev, uat) with the desired permissions.

With this configuration, its now as simple as dropping a SQL service account in one group, it and will now automatically fall into the correct environment level permissions.  In some cases its more permissive then it should be (prod has access to any prod server for example), but it kept things simple, and in our case, I’m not sure the extra security of per server / per environment really would have been a big win.

The harder stuff:

The only two remaining problems we had to solve was knowing what kind of backup the DBA’s did, and making sure we were not backing up more data than we needed.  These were also the two most difficult problems to solve because there wasn’t native way to do it (other than agent based backup).  We had two completely disjointed systems AND processes that we were trying to make work together.  It took many miles of running for me to put all the pieces together and it took a number of meetings with the DBA’s  to figure things out.  The good news is, both problems were solved by aspects of a single solution.  The bad news is, its a fairly complex process, but so far, its been very reliable.  Here’s how we did it.

 The DONE file:

Everything in the work flow is based on the presence of a simple file, what we refer to as the “done” file internally.  This file is used throughout the work flow for various things, and its the key in keeping the whole process working correctly.  Basically the workflow lives and dies by the DONE file.  The DONE file was also the answer to  our knowing what type of backup the DBA’s ran, so we could appropriately sync out backup type with them.

The DONE file follows a very rigid naming convention.  All of our scripts depend on this, and frankly naming standard are just a recommend practice (that’s for another blog post).

Our naming standard is simple:

%FourDigitYear%%2DigitMonth%%2DigitDay%_%24Hour%%Minute%%JobName(usually the sql instance)%_%backuptype%.done

And here are a few examples:

  • Default Instance of SQL
    • 20150302_2008_ms-sql-02_inc.done
    • 20150302_2008_ms-sql-02_full.done
  • Stg instance of SQL
    • 20150302_2008_ms-sql-02stg_inc.done
    • 20150302_2008_ms-sql-02stg_inc.done
The backup folder structure:

Equally as important as the done file, is our folder structure.  Again because this is a repeatable process, everything must follow a standard or the whole thing fall apart.

As you know we have a root folder structure that goes something like this ” \\ShareRoot\Environment\ServerName”.  Inside the servername root I create four folders and I’ll explain their use next.

  • .\Servername\DropOff
  • .\Servername\Queue
  • .\Servername\Pickup
  • .\Servername\Recovery

Dropoff:  This is where the DBA’s dump their backups initially.  The backup’s sit here and wait for our process to begin.

Queue:  This is a folder that we use to stage / queue the backup’s before the next phase.  Again I’ll explain in greater detail.  But the main point of this is to allow us to keep moving data outside of the Dropoff folder to a temp location in the queue folder.  You’ll understand why in a bit.

Pickup:  This is where our tape jobs are configured to look for data.

Recovery:  This is the permanent resting place for the data until it reaches the end of its configured retention period.

Stage 1: SQL side

Prerequisites:

  1. SQL needs a process that can check the Pickup folder for a done file, delete a done file and create a done file.  Our DBA’s created a stored procedure with parameters to handle this, but you can tackle it however you want, so long as it can be executed in a SQL maintenance plan.
  2. For each “job” in sql that you want to run, you’ll need to configure a “full” maintenance plan to run a full backup, and if you’re using SQL diffs, create an “inc” maintenance plan.  In our case, to try and keep things a little simple, we limited a “job” to a single SQL instance.

SQL maintenance plan work flow:

Every step in this workflow will stop on an error, there is NO continuing or ignore.

  1. First thing the plan does is check for the existence of a previous DONE file.
    1. If a DONE file exists, its deleted and an email is sent out to the DBA’s and sysadmins informing them.  This is because its likely that a previous process failed to run
    2. If a DONE file does not exist, we continue to the next step.
  2. Run our backup, whether its a full or inc.
  3. Once complete, we then create a new done file in the root of the PickupFolder directory.  This will either have a “full” or “inc” in the name depending on which maintenance plan ran.
  4. We purge backup’s in the Recovery folder that are past our retention period.

SQL side is complete.  That’s all the DBA’s need to do.  The rest is on us.  From here you can see how they were able to tell us whether or not they ran a full via the done file.  You can also glean a few things about the workflow.

  1. We’re checking to see if the last backup didn’t process
  2. We delete the done file before we start a new backup (you’ll read why in a sec).
  3. We create a new DONE file once the backup’s are done
  4. We don’t purge any backup’s until we know we had a successful backup.
Stage 1: SysAdmin side

Our stuff is MUCH harder, so do your best to follow along and let me know if you need me to clarify anything.

  1. We need a stage 1 script created, and stage 1 script will do the following in sequential order.
    1. Will need to know what job its looking for.  In our case with JAMS, we named our JAMS jobs based on the same pattern as the done file.  So when the job starts the script reads information from the running job and basically fills in all the parameters like the folder location, job name, etc.
    2. The script looks for the presence of ANY done file in the specific folder.
      1. If no done file exists, it goes into a loop, and checks every 5 minutes (this minimizes slack time).
      2. If a done file does exists we…
        1. If there are more than 1, we fail.  As we don’t know for sure which file is correct.  This is a fail safe
        2. If there is only one, we move on.
    3. Using the “_” in the done file, we make sure that it follows all our standards.  So for example, we check that the first split is a date, the second is a time, the third matches the job name in JAMS and the fourth is either an inc or full.  A failure in any one of these, will cause the job to fail and we’ll get notified to manually look into it.
    4. Once we verify the done file is good to go, we now have all we need to start the migration process.  So the next thing we do is use the date and time information, to create a sub-folder in the Queue folder.
    5. Now we use robocopy to mirror the folder structure to the .\Queue\Date_Time
    6. Once that’s complete, we move all files EXCEPT the done file to the Date_Time folder.
    7. Once that’s complete, we then move the done file into said folder.

And that completes stage 1.  So now you’re probably wondering, why wouldn’t we just move that data straight to the pickup folder? A few reasons.

  • When the backup to tape starts we want to make sure no new files are  getting pumped into the pickup folder.  You could say well just wait until the backup’s done before you move data along. I agree and we sort of do that, but we do it in a way that keeps the pickup folder empty.
    • By moving the files to a queue folder, if our tape process is messed up (not running) we can keep moving data out of the pickup folder into a special holding area, all the while still being able to keep track of the various backup sets (each new job would have a different date_timestamp folder in the queue folder).  Our biggest concern is missing a full backup.  Remember, if the SQL job see’s a done file, it deletes it.  We really want to avoid that if possible.
    • We ALSO wanted to avoid a scenario where we were moving data into a queue folder while the second stage job tried to move data out of the queue folder.  Again, buy have an individual queue folder for each job, this allows us to keep track of all the moving pieces and make sure that we’re not stepping on toes.

Gotcha to watch out for with moving files:

If you didn’t pick up on it, I mentioned that I used robocopy to mirror the directory structure, but I did NOT mention using it for moving the files.  There’s a reason for that. Robocopy’s move parameter actually does a copy + delete.  As you can imagine with a multi-TB backup, this process would take a while.  I built a custom “move-files” function in powershell that does a similar thing, and in that function I use “move-file” cmdlet which is a simple pointer update.  MUCH faster as you can imagine.

Stage 2: SysAdmin Side

We’re using JAMS to manage this, and with that, this stage does NOT run, unless stage 1 is complete.  Keep that in mind if you’re trying to use your own work flow solution.

Ok so at this point our pickup directory may or may not be empty, doesn’t matter, what does matter is that we should have one or more jobs sitting in our .\Queue\xxx folder(s).  What you need next is a script that does the following.

  1. When it starts, it looks for any “DONE” file in the queue folder.  Basically doing a recursive search.
    1. If one or more files are found, we do a foreach loop for each done file found and….
      1. Mirror the directory structure using robocopy from queue\date_time to the PickupFolder
        1. Then move the backup files to the Pickup folder
        2. Move the done file to the Pickup Folder
        3. We then confirm the queue \date_time is empty and delete it.
        4. ***NOTE:  Notice how we look for a DONE file first.  This allows stage 1 to be populating a new Queue sub-folder while we’re working on this stage without inadvertently moving data that’s in use by another stage.  This is why there’s a specific order to when we move the done file in each stage.
    2. If NO done files are found, we assume maybe you’re recovering from a failed step and continue on to….
  2. Now that all files (dumps and done) are in the pickup folder we….
    1. Look for all done files.  if any of them are full, the job will be a full backup.  if we find NO fulls, then its an inc.
    2. Kick of a backup using a CommVault scripts.  Again parameters such as the path, client, subclient, etc. are all pulled from JAMS in our case or already present in CommVault.  We use the information determined about the job type in step 2\1 as for what we’ll execute.  Again, this gives the DBA’s the power to control whether a full backup or an inc is going to tape.
    3. As the backup job is running, we’re constantly checking the status of the backup, about once a minute using a simple “while” statement.  If the job fails, our JAMS solution will execute the job two more times before letting us know and killing the job.
    4. if the job succeeds, we move on to the next step
  3. Now we follow the same moving procedure we used above, except this time, we have no queue\date_time folder to contend with.
    1. Move the backup files from Pickup to the Recovery folder.
    2. Move the done files
    3. Check that the Pickup folder is empty
      1. If yes, we delete and recreate it.  Reason?  Simple, its the easiest way to deal with a changing folder structure.  if a DBA deletes a folder in the DropOff directory, we don’t want to continue propagating a stale object.
      2. If not we bomb the script and request manual intervention.
  4. if all that works well, we just completed out backup process.

Issues?

You didn’t think I was going to say it was perfect did you?  Hey, I’m just as hard on myself as I am on vendors.  So here is what sucks with the solution.

  1. For the longest time, *I* was the only one that knew how to troubleshoot it.  After a bit of trainings, and running into issues though, my team is mostly caught up on how to troubleshoot.  Still, this is the issue with home brewed solutions, and ones entirely scripted, don’t help.
  2. Related to the above, if I leave my employer, I’m sure the script could be modified to serve other needs, but its not easy, and I’m sure it would take a bit of reverse engineering.  Don’t get me wrong, I commented the snot out of the script, but that doesn’t make it any easier to understand.
  3. Its tough to extend.  I know I said it could, but really, I don’t want to touch it unless I have to (other than parameters).
  4. When we do UAT refreshes, we need to disable production jobs so the DBA’s have access to the production backups for as long as they need.  its not the end of the world, but it requires us to now be involved at a low level with development refreshes, where as before that wasn’t any involvement on our side.
  5. We’ve had times where full backup’s have been missed tape side. That doesn’t mean they didn’t get copied to tape, rather they were considered an “inc” instead of being considered a “full”. This could easily be fixed simply by having the SQL stored procedure checking if the done file that’s about to be deleted is a full backup and if so, to replace it with a new full DONE file, but that’s not the way it is now, and that depends on the DBA’s.  Maybe in your case, you can account for that.
  6. We’ve had cases where the DBA’s do a UAT refresh and copy a backup file to the recovery folder manually.  When we go to move the data from the pickup folder to the recovery folder, our process bombs because it detects that the same file already exists.  Not the end of the world for sure, easy enough to troubleshoot, but its not seamless.  An additional workaround to this could be to do an md5 hash comparison.  If the file is the same, just delete it out of the pickup directory and move on.
  7. There are a lot of jobs to define and a lot of places to update.
    1. In JAMS we have to create 2 jobs + a workflow that links them per SQL job
    2. in CommVault we have to define the sub-client and all its settings.
    3. On the backup share, 4 folders need to be created per job.

Closing thoughts:

At first glance I know its REALLY convoluted looking.  A  Rube Goldberg for sure.  However, when you really start digging into it, its not as bad as it seems.  In essence, I’m mostly using the same workflow multiple times and simply changing the source / destination.  There are places  for example when I’m doing the actual backup, where there’s more than the generic process being used, but its pretty repetitive otherwise.

In our case, JAMS is a very critical peace of software to making this solution work.  While you can do this without the software, it would be much harder for sure.

At this point, I have to imagine that you’re wondering if this is all worth it?  Maybe not to companies with deep pockets.   And being honest, this was actually one of those processes that I did in house and was frustrated that I had to do it.  I mean really, who wants to go through this level of hassle right?  Its funny, I thought THIS would be the process i was troubleshooting all the time, and NOT Veeam.  However, this process for the most part has been incredibly stable and resilient.  Not bragging, but its probably because I wrote the workflow.  The operational overhead I invested saved a TON of capex.  Backing up SQL natively with CommVault has a list price of 10k per TB, before compression.  We have 45TB of SQL data AFTER compression.  You do the math, and I’m pretty sure you’ll see why we took the path we did.    Maybe you’ll say, that CommVault is too expensive, and to some degree that’s true, but even if you’re paying 1k per TB, if you’re being pessimistic and assuming that 45TB = 90TB before compression, I saved 90k + 20% maintenance each year, and CommVault doesn’t cost anywhere close to 1k per TB, so really, I saved a TON of bacon with the process.

Besides the cost factor, its also enabled us to have a real grip on what’s going happening with SQL backups.  Before it was this black box that we had no real insight into.  You could contend that’s a political issue, but then I suspect lots of companies have political issues.  We now know that SQL ran a full backup 6 days ago.  We now have our backup workflow perfectly coordinated.  We’re not starting to early, and we’re kicking off with in 5 minutes of them being done, so we’re not dealing with slack time either.  We’re making sure that our backup application + backup tape is being used in the most prudent way.  Best of all, our DBA’s now have all their dump files available to them, their environment refreshes are reasonable easy, the backup storage is FAST, we have backup’s centralized and not stored with the server.  All in all, the solution kicks ass in my not so humble opinion.  Would I have loved to do CommVault natively?  For sure, no doubt its ultimately the best solution, but this is a compromise that allowed us to continue using CommVault, save money and accomplish all our goals.